Drop Down Plenum Installation Instructions    

  1. Locate the assembly and unpack from the crate.
  2. If the MUA risers are to be field cut, cut the risers in as desired. (Note: The manufacturer installs a 2" flange for a MUA riser. This flange is intended to slip inside a MUA boot that is supplied by the installer.)
  3. Locate the wall and ceiling joists that will support the assembly.
  4. Install the threaded rod and angle that will be used to hang the assembly from the ceiling joists.
  5. Move the assembly into position as indicated by the markings on the product. Note the location of the 78" A.F.F. critical hanging height marking. This point should be level with the bottom back edge of the hood when it is hung later.
  6. Install the threaded rod into the hood hanging angles and use heavy-duty nuts to secure the connection.
  7. Caulk the seams between the wall and the drop down plenum assembly.
Ventilation Direct is committed to customer service and on time, accurate delivery of superior Ventilation products.

Call 1.866.433.8335 for a friendly customer service representative that can customize your exhaust fan, heater or supply air package while providing you a fast quotation including drawings and submittal packages. Our product line includes UL and ANSI listed commercial and industrial exhaust fans, heaters, make-up air units, motors and more with a two year warranty.